Solids control system for drilling operation

The mud returned from the wellhead is transferred shale shaker through the mud distributor; the mud treated by the vibrating screens is discharged into the vacuum degasser; and then it is sent to the desander and Desilter cyclone by sand pumps in turn, and then the treated mud is treated by the decanter centrifuge, which can be further sheared or weighted before being pumped into the well by the drilling pump. In the process of drilling mud treatment, the number of units of purification equipment can be selected so that the solid phase content and viscosity of the mud can be controlled within the ideal range to meet the requirements of the drilling process.

Rachel, what can we do at the daily work can prolong the service time of solids control system, we AIPU proposed:
☞Regularly check the operation status of the equipment, such as whether the screen mesh of the shale shaker is broken or not, whether the cyclone of the desander and desilter is blocked, and whether the drum of the centrifuge is worn or not, any blockage of pipeline...
☞Keep the equipment clean and hygienic, clean the oil and sundries on the surface of the equipment in time.
☞Check the lubrication of the equipment, and add lubricating oil and grease regularly.
☞Check the electrical system of the equipment to ensure the normal operation of electrical equipment.
☞Replace the wearing parts with serious wear and tear, such as the screen mesh of the vibrating screen, the cyclone of the desander and desilter, and the drum of the centrifuge.
Please contact us for more details, we can supply API standard solids control system.
